Mark Frame Bridge
Marathon Sno-Kickers Pic River Snowmobile
Bridge Project
August 13, 2001 Images
Images below are 10% of the original size.
Click on an image to see the image at 25% of the original size.
100% size images would take up too much room to put on this
server. After clicking on an image, click on the "back"
button on your browser to return to this page. If you want a
larger picture of any of the images, contact the
.
|
13 August 2001
The dozer is lowering the hill on the
east ramp down to the bridge. This is being done to help
ensure the last section of the bridge will not drag on
the ground when being launched.
|
|
The crane base had to be moved a
few feet. A load of rock fill is being delivered.
|
|
The excavator is moving the rock
fill for the extended crane base. The weeping tile was
placed in the base to help drain off ground water seeping
from the hill.
|
|
The 175t crane arrived in the
afternoon.
|
|
This transport has the swamp pads
for the 175t crane.
|